GE project Israel - transport of steam turbine rotor by Ilyushin plane - 76. Due to the complexity of transport, the delivery required additional engineering and tying of cargo. The rotor with the blades had to be delivered urgently after the repair, which required modifications to the transport frame, which was not originally planned for air transport. Optima Power delivered the transport frame and provided additional support during the redesign of the transport frame. We are proud to have been a part of this complex project.